scheduled_date, started_at, and completed_at in ISO 8601 format with no restriction on historical dates. The system will flag these in audit logs with import attribution as Omar noted.scheduled_date, started_at, and completed_at in ISO 8601 format with no restriction on historical dates. The system will flag these in audit logs with import attribution as Omar noted.